So you’ve submitted your planning drawings and received your permission from the local council. The drawings were modelled in Revit with a low level of detail, so next you want to start adding the detail of construction to your walls. The below images shows a floor plan at planning level of detail so only blank wall detail represented by purple for proposed construction. Using the Detail Level option at the bottom of the screen will change this to a detail view.

You can change the build-up of the wall to show your construction layers. Select the wall > Edit Type > Structure and then change the layers accordingly.